Projects

Projects and case studies

Each case study sets out the problem, the investigation findings, the repair methodology and the outcome, together with programme duration, access strategy and value band.

Case studies

Carpark structure repair & protection — waterfront mixed-use building
Strata Docklands

Carpark structure repair & protection — waterfront mixed-use building

Scope
Concrete repair · Corrosion protection · Water leak repair
Duration
16 weeks
Access
Internal, level-by-level staging
View case study →
Defect rectification package — new-build apartment handover
Builders & developers Richmond

Defect rectification package — new-build apartment handover

Scope
Water leak repair · Cladding rectification · Defect close-out
Duration
8 weeks
Access
EWP + internal access
View case study →
Balcony remediation program — 42-lot apartment building
Strata St Kilda

Balcony remediation program — 42-lot apartment building

Scope
Balcony remediation · Concrete repair · Water leak repair
Duration
14 weeks
Access
EWP + internal access, staged by stack
View case study →
Warehouse slab & joint rehabilitation — live distribution facility
Industrial Brunswick

Warehouse slab & joint rehabilitation — live distribution facility

Scope
Concrete repair · Industrial flooring · Joint systems
Duration
6 weeks, night shifts
Access
Ground works, zoned closures
View case study →
Heritage masonry & lintel remediation — interwar apartment block
Heritage Hawthorn

Heritage masonry & lintel remediation — interwar apartment block

Scope
Facade remediation · Carbon fibre strengthening · Heritage masonry
Duration
11 weeks
Access
Scaffold, street elevation; EWP rear
View case study →
Facade investigation & remediation — 18-storey commercial tower
Commercial Southbank

Facade investigation & remediation — 18-storey commercial tower

Scope
Facade remediation · Difficult access · Concrete repair
Duration
9 weeks (investigation 2, works 7)
Access
Rope access, all elevations
View case study →

The case studies shown are representative of our methodology and reporting format. Project details are published as client permissions are confirmed.

Arrange a site assessment

A written condition report with an itemised scope, prepared to a standard your committee, consulting engineer or board can act on.