About

About Titan Remedial Solutions

Titan Remedial Solutions is a remedial building contractor serving Melbourne and Victoria, working across owners corporation, commercial, industrial, heritage and public assets. Our method is to establish the cause before specifying the repair.

Our approach

A significant proportion of the remedial work we are called to is repeat work: a patch over chloride-contaminated concrete, a membrane installed over unresolved structural movement, repointing over a corroding lintel. In most cases the original contractor was not incompetent. They were pricing without investigation, in a market that rewards the lowest estimate.

We treat investigation as a separate, chargeable deliverable resulting in a written condition report. The repair scope is developed from those findings: itemised so it can be compared against other quotations, staged so it can be funded across budget cycles, and documented so the quality of concealed work remains verifiable afterwards.

Where we work

Metropolitan Melbourne and regional Victoria, across owners corporation, commercial, industrial, heritage and public assets. Owners corporations and their managers represent our largest area of specialisation.

Site photography

Principles

How we operate

01

Investigation before pricing

We do not price work we have not investigated. A scope built from tested evidence produces a price that holds, and a defect schedule that allows competing quotations to be compared on equal terms.

02

Documented delivery

Defect schedules, inspection and test plans, hold-point records and completion reports. Work that is subsequently concealed is photographed before it is covered, so its quality remains verifiable.

03

Specified for design life

Repair systems are selected for the exposure conditions and service life required, and we state the design life we expect them to achieve rather than the one that reads best.

04

Clear commercial terms

Contract terms consistent with the Security of Payment Act (Vic), variations documented and approved before work proceeds, and insurance and registration evidence provided at engagement.

Credentials

Credentials and compliance

Written condition report Before any scope is priced
Make-safe response Safety risks attended first
SOP Act terms Security of Payment Act (Vic)
ABN 58 699 129 327 Verifiable on the ABN register ↗

Arrange a site assessment

A written condition report with an itemised scope, prepared to a standard your committee, consulting engineer or board can act on.