Insights

Technical insights

Guidance on the defects, procurement questions and regulatory obligations that arise most often for owners corporations, facilities managers and consulting engineers.

Concrete deterioration: warning signs and their diagnostic significance

How spalling, rust staining and cracking should be interpreted before they develop into a structural scope, and why the visible damage understates the extent of contamination.

Read article →

Victorian apartment defects: what the published research shows

Published research and Victorian Government findings on where apartment buildings fail, with the figures, the sources and the qualifiers that determine what each figure means.

Read article →

Security of Payment in Victoria: the 2026 amendments and their effect on remedial contracts

The Victorian Security of Payment Act was substantially rewritten in April 2026 — excluded amounts abolished, reference dates removed, and a statutory pathway introduced for the release of performance security. The implications for remedial contracting.

Read article →

Funding pathways for remedial works in Victorian owners corporations

Special levies, maintenance plans and staged scopes — the funding mechanisms available for major remedial works under the Owners Corporations Act 2006, and the resolution thresholds that apply to each.

Read article →

Access methodology for facade works: comparing rope access, scaffold and platforms

The cost structure of each access method, the conditions under which each is appropriate, and the questions that establish whether an access allowance has been properly derived.

Read article →

The scope of a condition investigation, and what the report should contain

The investigation that should precede any remedial quotation — the desktop review, the survey, the test methods selected by mechanism, and the contents of a condition report that can be relied upon.

Read article →

Comparing remedial quotations: a method for assessing non-comparable scopes

Three quotations for the same building commonly price three different scopes. A structured method for committees and building managers to establish comparability before selecting a contractor.

Read article →

Balcony leaks: failure mechanisms and cost apportionment in Victorian strata

The five failure points behind most balcony leaks, why the point of entry rarely corresponds to the point of appearance, and how repair cost is apportioned in Victorian strata.

Read article →

Waterproofing membrane systems: applications, limitations and selection

Liquid-applied, PMMA, sheet and cementitious membranes — the applications each system suits, the conditions under which each fails, and why substrate and detailing govern the outcome more than product selection.

Read article →

New articles are published twice monthly.

A question not covered here?

We are glad to answer general questions. Where the question concerns a specific building, a site assessment is the appropriate starting point.